Electric work progress

It looks like a lot of the electrical work is wrapping up with the boxes and wires placed in the walls. The recessed lights on the ceiling are also in place but they don't have bulbs in yet. We hope the sheetrocking can be done next week so we can get to put a base coat of paint on before they come in with the cabinets and other stuff.

No progress on the floor yet.